Starting Work on The River Went in Yorkshire

Although this is the start of what is planned to be a wider project that tackles multiple issues throughout the full length of this heavily-modified river, the first set of works are shaping up really pleasingly. 
Click Picture to Launch on YouTube
Alec and the rest of the YWT team have made impressive progress to organise and deliver the program of works that we designed on just around 1 km of the River Went, on a project supported by the Environment Agency.

It was particularly impressive due to a last minute loss of the previous project manager due to a career move. In the video you can see how Alec worked with the WTT to power through the first, steep part of the learning-curve on in-river structural improvements to a heavily-modified river.

The main challenges stemmed from the historic realignment of the channel (and general lack of in-stream structure/debris necessary to create vital habitat for different lifecycle stages of fish and other aquatic life). Coupled with the relatively low gradient and fine particulate material/potential associated diffuse-pollution inputs from upstream, this had made the channel very uniform (boring) and also lacking in diverse substrate (bed material).

While the future parts of this project will explore ways of improving land-use (and other measures) to reduce the particulate material runoff, the creation of alternating scour and deposition in this section should significantly increase the complexity (and hence value) of the habitat here. There is also, now a massive amount of extra cover from predation - which will help to keep populations of predators and prey in a more resilient balance.

The increased complexity (and scour/deposition processes) were complemented by the "seeding" of gravel upstream of some of the new "roughness-generating" structures in the channel. Spate flows redistributing that gravel should mimic the creation of spawning conditions that have been historically cut-off by changes to land-use (open-cast mining has inverted top and sub-soil horizons in the upper catchment!). 

Natural gravel inputs have also been constrained by the channel being straightened and locked in place. Normally, the gradual movement of a channel across a floodplain would cut into gravel "lenses" in the banks and continually replenish supplies to species that need gravel to breed.

You can see Alec describing this first phase of works in the embedded version of the video here:


Comments

Popular posts from this blog

Why Presume to Remove Weirs? (with River Dove Case Study)

Weirs and the Backwards Ways that Rivers Work One of my favourite sayings on river restoration is a mangled quote from a movie "... boxing is an unnatural act. Everything in boxing is backwards: sometimes the best way to deliver a punch is to step backwards...but step back too far and you ain't fighting at all ". So my mangled version starts out "Everything in rivers is backwards...". Basically, I never seem to run out of new examples of "what SEEMS to happen in a river is actually the complete opposite of what really happens". The rest of this article looks at many of the "backwards" things about weirs and rivers - and finishes off with a real-world case-study that is playing out right now on the River Dove . One spoiler alert is that, from an ecological point of view, it is almost always safe to assume that: The best biological outcome for a river is the removal of some or all of an artificial weir.  Now, I don't exp

Porter Brook - Channel Habitat Improvement in De-Culverted City Centre Stream

There will be more pictures and video to come to document this bold project by Sheffield City Council to uncover a section of stream that used to live beneath a factory floor. They are in the process of creating a "pocket park" that will provide new flood-water storage (when the rivers are in spate) and an improved public park amenity (when the rivers are calm). The pocket park itself will be excavated out from the current high ground level (and a major construction project is underway at the moment to achieve this). The Wild Trout Trust were brought in to design in-channel features and riverbed morphology that would maxmise the improvements for the ecology of the stream - including for the prospects of a small and fragmented native population of wild brown trout. The site after uncovering the stream - but before the in-channel works Part way through the Pocket Park Construction - new gabion walls and flood defenses Channel with boulder clusters, log deflector-consoli

The Wild Trout Trust: A Film by Chalkstream Fly

Here is a great short piece that captures what the work of the Wild Trout Trust is all about. It was made for (and broadcast on) the very first "World Fishing Day" - a 24hr live fishing programme created by FishingTV.com . It features TV personalities (and WTT President & Vice President respectively!) Jon Beer and Matthew Wright as well as Director of the Trust, Shaun Leonard. You can see more work by the film-makers on Chalkstreamfly.co.uk  and, of course, you can join the Wild Trout Trust here: WTT Membership Paul Gaskell (Trout in the Town Conservation Officer)