Skip to main content

Unintended de-stabilising consequences of dredging...

The WTT borrowed the fabulous Emriver kit from Severn Rivers Trust during the 2013 CLA gamefair. It allowed us to set up a whole range of common river-channel scenarios in an accurate scaled-down simulation. Dredging was one of the things we modelled:

Dredging river-bed material is something that is of particular relevance to the urban/heavily-modified channel environment. As is so often the case with rivers, what seems like the obvious and correct thing to do can actually blow up in your face (or someone else's face several miles up or downstream!).

Just as intriguing are the potential knock-on impacts of ad-hoc dredging in rural environments in an effort to increase the capacity to drain land...

Nature abhors a vacuum and removing accumulated material from a river channel can have far-reaching and unintended consequences. The first principle effect is to increase the demand for eroded river-bed and river-bank material from upstream. This can dramatically increase the rate of erosion in upstream reaches.

It also rapidly leads to the re-filling of the dug-out channel... (back to square one, so you dredge again....)

The other major/worrying effect is the interruption of the transport of sediment downstream of the dredged reach. Whilst the bed material is being re-accumulated in the dredged area, there is far less material being supplied downstream. That "cutting off" of the sediment supply causes a net increase in the erosion downstream of the dredged reach as well. This is due to stopping the supply of material that would otherwise "patch up" and fill in eroded areas to produce a more stable dynamic equilibrium state. How many people who undertake dredging understand these processes? Is the move to "fast
-track" UK-landowners' ability to dredge their own streams with a much lower requirement for external assessment likely to create more problem than it solves?

In addition to all that, the video below might give an interesting perspective on dredging works for the purpose of flood-water conveyance in areas downstream of bridges and weirs in modified waterbodies...


Comments

Tim Holt-Wilson said…
This comment has been removed by the author.
Tim Holt-Wilson said…
Great use of a sand box as a communication tool.

Popular posts from this blog

Why Presume to Remove Weirs? (with River Dove Case Study)

Weirs and the Backwards Ways that Rivers Work One of my favourite sayings on river restoration is a mangled quote from a movie "... boxing is an unnatural act. Everything in boxing is backwards: sometimes the best way to deliver a punch is to step backwards...but step back too far and you ain't fighting at all ". So my mangled version starts out "Everything in rivers is backwards...". Basically, I never seem to run out of new examples of "what SEEMS to happen in a river is actually the complete opposite of what really happens". The rest of this article looks at many of the "backwards" things about weirs and rivers - and finishes off with a real-world case-study that is playing out right now on the River Dove . One spoiler alert is that, from an ecological point of view, it is almost always safe to assume that: The best biological outcome for a river is the removal of some or all of an artificial weir.  Now, I don't exp...

The Wild Trout Trust: A Film by Chalkstream Fly

Here is a great short piece that captures what the work of the Wild Trout Trust is all about. It was made for (and broadcast on) the very first "World Fishing Day" - a 24hr live fishing programme created by FishingTV.com . It features TV personalities (and WTT President & Vice President respectively!) Jon Beer and Matthew Wright as well as Director of the Trust, Shaun Leonard. You can see more work by the film-makers on Chalkstreamfly.co.uk  and, of course, you can join the Wild Trout Trust here: WTT Membership Paul Gaskell (Trout in the Town Conservation Officer)

First Survey Record of Wild Trout Returning to Lyme Brook Habitat Works Site!

You may have seen the first three phases of works on the middle reaches of the Lyme Brook (shown in previous blogs Here and Here ) from project works that began in 2015... Well although the first surveys after that work found some nice coarse fish populations - there was no cold hard evidence that any trout had found the newly-improved habitat...Until now! EA Midlands Survey Teams reportedly found "More than one...but less than five" wild trout like this one on Sept. 7th 2017 I received a phone call today from Matt Lawrence who is the EA's Catchment Host for the Trent Valley Catchment Partnership (with key partners Groundwork West Midlands and the Wild Trout Trust who conceived and delivered the habitat works). Matt told me that he'd had some exciting preliminary reports from a EA Midlands fisheries surveys team. Their survey on 7th September had caught several wild trout as part of their sample on the habitat works site. These are the first modern records ...