Re-Meandering The Upper Lyme Brook

Take a bow Groundwork West Midlands (particularly Richard, Francesca & Chris) - myself and Tim Jacklin from team Wild Trout Trust really enjoyed working with you and the great volunteers from the National Citizens Service.

Together we turned what was one of possibly the straightest of any straightened sections of brook into a section with quite a lot more variety. This is what the section looked like in winter:

Though, in high summer, almost none of the water was actually visible when the 360 digger arrived on site ahead of the volunteers (I wanted a day to sculpt the basic shape of the brook before Tim, Francesca, Chris and the volunteers came on site for days 2 and 3).

So, once we found the wet bit of the river, operator David and me could start to collaborate in remodelling the stream. I'm always in awe of how much control these folks have with a machine and bucket - and we soon got into a great working and communication routine. It is fantastic to see the physical changes to the river taking shape before your eyes - and always amazing that what I can visualise mentally is possible for a talented driver to create in reality.

Re-casting the material won from creating the bend allows a shallow bench/small floodplain to be recreated within the incised channel.

Using the existing root-masses on the opposite bank to each bench that we created let us steer the river left and right...

Having created a new cross-sectional profile and plan-form at the end of the first day - that paved the way for the team of specialists and volunteers to consolidate and improve the basic skeleton of the wiggling brook.


Having consolidated the bank toe along the deeper (scour pool) habitat on the outside of each bend with brash (which also produced instant cover habitat) - we could then create a framework to stabilise the shallow benches. This was done by installing a larger log towards the centre of each bench which would retain material on its upstream side. Then radial "laths" of long, straight and smaller diameter stems were staked over the top of a thin layer of brash.

As well as stabilising the redistributed material, this allowed us to plant native plant species (principally flag iris and sedge) in amongst this matrix. Over time, as well as providing valuable floral diversity, the root masses of those plants will also act to further stabilise the new path and profile of the brook.
Plug plants ready for planting in the newly-created brash-matrix framework (background)

Well done all - thank you for your hard work across all aspects of the project, and thanks for going along with my design ideas too. Watch this space for updates on how these works bed in over time (and any additional work we can do on the site when the opportunity arises).

If you like this project, share this post so it can inspire other folks too.

Paul








Comments

Popular posts from this blog

First Survey Record of Wild Trout Returning to Lyme Brook Habitat Works Site!

You may have seen the first three phases of works on the middle reaches of the Lyme Brook (shown in previous blogs Here and Here) from project works that began in 2015...

Well although the first surveys after that work found some nice coarse fish populations - there was no cold hard evidence that any trout had found the newly-improved habitat...Until now!
I received a phone call today from Matt Lawrence who is the EA's Catchment Host for the Trent Valley Catchment Partnership (with key partners Groundwork West Midlands and the Wild Trout Trust who conceived and delivered the habitat works). Matt told me that he'd had some exciting preliminary reports from a EA Midlands fisheries surveys team. Their survey on 7th September had caught several wild trout as part of their sample on the habitat works site.
These are the first modern records of trout in the brook and is also the exciting news that we have been waiting for on these first phases of work to create spawning, juvenile an…
Catching and Releasing the first Fly-Caught wild trout from a stream that was dug out of a city-centre pipe was probably the highlight of 2016 for me!

Buried in a brick tunnel under England's industrial developments of the 1800s, a section of the Porter Brook in Sheffield was brought back to the surface by a bold project co-ordinated by Sheffield City Council and involving the Wild Trout Trust, The Environment Agency and many more partners.

You can now witness the actual process of freeing the Brook from its pipe - and the creation of functioning trout-stream habitat in this short video.



Yet, the above video does not show the completed park that was a huge part of the entire project - and it does not show the planted vegetation beginning to develop in the summer of 2016. And, it does not show any fly fishing or video of a trout capture...

But the film, below, that was made by the excellent Huckleberry Films as part of the Canal & Rivers Trust "Living Waterways" awar…

A previously buried section of stream produces the first fly caught trout in >160 years

As near as I can work out from the archaeology report, this section of river - recently brought back to the surface in dramatic fashion by Sheffield City Council, the EA and the WTT partnership - was buried in a low brick tunnel somewhere around 1853 to 1868. The northern half of the site was certainly buried underground BEFORE the time the 1853 map was produced....and the rest of the brick tunnel was placed over the top of the stream before the map of 1868...

Of course, it is not easy to tell what the water quality was like in that section even BEFORE the stream was buried...and whether there were trout surviving in the stream when it was sealed underground...

What is damned sure is that you couldn't wave a fly fishing rod around in that underground tunnel once they'd built it!

This was still the case until the completion of the massive project to remove the brickwork and create an attractive "pocket park" in the city centre. You might have seen from This Previous …