Re-Meandering The Upper Lyme Brook

Take a bow Groundwork West Midlands (particularly Richard, Francesca & Chris) - myself and Tim Jacklin from team Wild Trout Trust really enjoyed working with you and the great volunteers from the National Citizens Service.

Together we turned what was one of possibly the straightest of any straightened sections of brook into a section with quite a lot more variety. This is what the section looked like in winter:

Though, in high summer, almost none of the water was actually visible when the 360 digger arrived on site ahead of the volunteers (I wanted a day to sculpt the basic shape of the brook before Tim, Francesca, Chris and the volunteers came on site for days 2 and 3).

So, once we found the wet bit of the river, operator David and me could start to collaborate in remodelling the stream. I'm always in awe of how much control these folks have with a machine and bucket - and we soon got into a great working and communication routine. It is fantastic to see the physical changes to the river taking shape before your eyes - and always amazing that what I can visualise mentally is possible for a talented driver to create in reality.

Re-casting the material won from creating the bend allows a shallow bench/small floodplain to be recreated within the incised channel.

Using the existing root-masses on the opposite bank to each bench that we created let us steer the river left and right...

Having created a new cross-sectional profile and plan-form at the end of the first day - that paved the way for the team of specialists and volunteers to consolidate and improve the basic skeleton of the wiggling brook.


Having consolidated the bank toe along the deeper (scour pool) habitat on the outside of each bend with brash (which also produced instant cover habitat) - we could then create a framework to stabilise the shallow benches. This was done by installing a larger log towards the centre of each bench which would retain material on its upstream side. Then radial "laths" of long, straight and smaller diameter stems were staked over the top of a thin layer of brash.

As well as stabilising the redistributed material, this allowed us to plant native plant species (principally flag iris and sedge) in amongst this matrix. Over time, as well as providing valuable floral diversity, the root masses of those plants will also act to further stabilise the new path and profile of the brook.
Plug plants ready for planting in the newly-created brash-matrix framework (background)

Well done all - thank you for your hard work across all aspects of the project, and thanks for going along with my design ideas too. Watch this space for updates on how these works bed in over time (and any additional work we can do on the site when the opportunity arises).

If you like this project, share this post so it can inspire other folks too.

Paul








Comments

Popular posts from this blog

Why Presume to Remove Weirs? (with River Dove Case Study)

Weirs and the Backwards Ways that Rivers Work One of my favourite sayings on river restoration is a mangled quote from a movie "... boxing is an unnatural act. Everything in boxing is backwards: sometimes the best way to deliver a punch is to step backwards...but step back too far and you ain't fighting at all ". So my mangled version starts out "Everything in rivers is backwards...". Basically, I never seem to run out of new examples of "what SEEMS to happen in a river is actually the complete opposite of what really happens". The rest of this article looks at many of the "backwards" things about weirs and rivers - and finishes off with a real-world case-study that is playing out right now on the River Dove . One spoiler alert is that, from an ecological point of view, it is almost always safe to assume that: The best biological outcome for a river is the removal of some or all of an artificial weir.  Now, I don't exp

The Wild Trout Trust: A Film by Chalkstream Fly

Here is a great short piece that captures what the work of the Wild Trout Trust is all about. It was made for (and broadcast on) the very first "World Fishing Day" - a 24hr live fishing programme created by FishingTV.com . It features TV personalities (and WTT President & Vice President respectively!) Jon Beer and Matthew Wright as well as Director of the Trust, Shaun Leonard. You can see more work by the film-makers on Chalkstreamfly.co.uk  and, of course, you can join the Wild Trout Trust here: WTT Membership Paul Gaskell (Trout in the Town Conservation Officer)

Porter Brook - Channel Habitat Improvement in De-Culverted City Centre Stream

There will be more pictures and video to come to document this bold project by Sheffield City Council to uncover a section of stream that used to live beneath a factory floor. They are in the process of creating a "pocket park" that will provide new flood-water storage (when the rivers are in spate) and an improved public park amenity (when the rivers are calm). The pocket park itself will be excavated out from the current high ground level (and a major construction project is underway at the moment to achieve this). The Wild Trout Trust were brought in to design in-channel features and riverbed morphology that would maxmise the improvements for the ecology of the stream - including for the prospects of a small and fragmented native population of wild brown trout. The site after uncovering the stream - but before the in-channel works Part way through the Pocket Park Construction - new gabion walls and flood defenses Channel with boulder clusters, log deflector-consoli