Starting Work on The River Went in Yorkshire

Although this is the start of what is planned to be a wider project that tackles multiple issues throughout the full length of this heavily-modified river, the first set of works are shaping up really pleasingly. 
Click Picture to Launch on YouTube
Alec and the rest of the YWT team have made impressive progress to organise and deliver the program of works that we designed on just around 1 km of the River Went, on a project supported by the Environment Agency.

It was particularly impressive due to a last minute loss of the previous project manager due to a career move. In the video you can see how Alec worked with the WTT to power through the first, steep part of the learning-curve on in-river structural improvements to a heavily-modified river.

The main challenges stemmed from the historic realignment of the channel (and general lack of in-stream structure/debris necessary to create vital habitat for different lifecycle stages of fish and other aquatic life). Coupled with the relatively low gradient and fine particulate material/potential associated diffuse-pollution inputs from upstream, this had made the channel very uniform (boring) and also lacking in diverse substrate (bed material).

While the future parts of this project will explore ways of improving land-use (and other measures) to reduce the particulate material runoff, the creation of alternating scour and deposition in this section should significantly increase the complexity (and hence value) of the habitat here. There is also, now a massive amount of extra cover from predation - which will help to keep populations of predators and prey in a more resilient balance.

The increased complexity (and scour/deposition processes) were complemented by the "seeding" of gravel upstream of some of the new "roughness-generating" structures in the channel. Spate flows redistributing that gravel should mimic the creation of spawning conditions that have been historically cut-off by changes to land-use (open-cast mining has inverted top and sub-soil horizons in the upper catchment!). 

Natural gravel inputs have also been constrained by the channel being straightened and locked in place. Normally, the gradual movement of a channel across a floodplain would cut into gravel "lenses" in the banks and continually replenish supplies to species that need gravel to breed.

You can see Alec describing this first phase of works in the embedded version of the video here:


Comments

Popular posts from this blog

First Survey Record of Wild Trout Returning to Lyme Brook Habitat Works Site!

You may have seen the first three phases of works on the middle reaches of the Lyme Brook (shown in previous blogs Here and Here) from project works that began in 2015...

Well although the first surveys after that work found some nice coarse fish populations - there was no cold hard evidence that any trout had found the newly-improved habitat...Until now!
I received a phone call today from Matt Lawrence who is the EA's Catchment Host for the Trent Valley Catchment Partnership (with key partners Groundwork West Midlands and the Wild Trout Trust who conceived and delivered the habitat works). Matt told me that he'd had some exciting preliminary reports from a EA Midlands fisheries surveys team. Their survey on 7th September had caught several wild trout as part of their sample on the habitat works site.
These are the first modern records of trout in the brook and is also the exciting news that we have been waiting for on these first phases of work to create spawning, juvenile an…
Catching and Releasing the first Fly-Caught wild trout from a stream that was dug out of a city-centre pipe was probably the highlight of 2016 for me!

Buried in a brick tunnel under England's industrial developments of the 1800s, a section of the Porter Brook in Sheffield was brought back to the surface by a bold project co-ordinated by Sheffield City Council and involving the Wild Trout Trust, The Environment Agency and many more partners.

You can now witness the actual process of freeing the Brook from its pipe - and the creation of functioning trout-stream habitat in this short video.



Yet, the above video does not show the completed park that was a huge part of the entire project - and it does not show the planted vegetation beginning to develop in the summer of 2016. And, it does not show any fly fishing or video of a trout capture...

But the film, below, that was made by the excellent Huckleberry Films as part of the Canal & Rivers Trust "Living Waterways" awar…

A previously buried section of stream produces the first fly caught trout in >160 years

As near as I can work out from the archaeology report, this section of river - recently brought back to the surface in dramatic fashion by Sheffield City Council, the EA and the WTT partnership - was buried in a low brick tunnel somewhere around 1853 to 1868. The northern half of the site was certainly buried underground BEFORE the time the 1853 map was produced....and the rest of the brick tunnel was placed over the top of the stream before the map of 1868...

Of course, it is not easy to tell what the water quality was like in that section even BEFORE the stream was buried...and whether there were trout surviving in the stream when it was sealed underground...

What is damned sure is that you couldn't wave a fly fishing rod around in that underground tunnel once they'd built it!

This was still the case until the completion of the massive project to remove the brickwork and create an attractive "pocket park" in the city centre. You might have seen from This Previous …